Extrusion Solutions began building specialized extrusion equipment in 1993. In 2005 the company became Extrucore, rebuilt around a simple standard: design it carefully, test it properly, and stand behind it.
For more than thirty years we've focused on one part of the line: what happens to the tube after it leaves the die. Lumen air, drying, weir alignment. The details that decide whether medical and specialty tubing holds its dimensions.
Today our equipment runs on tubing lines around the world. We kept the Extrusion Solutions name on our website so the engineers who have relied on us for years can still find us, while everything we build carries the Extrucore name.
Every unit is pressure calibrated on a NIST-calibrated ADT681 test system before it ships, and records are kept for five years.
From the first LumenAir to Rapid-Step and the compact LA1C, each product came from a real problem on a real tubing line.
Straight answers, honest lead times and specifications you can check against your own gauges.
A three-year warranty on every product, plus recalibration service for units that have been in the field for years.

Precision air for the internal lumens of extruded tubing.
View LumenAir →
Repeatable pressure steps for taper and bump tubing.
View Rapid-Step →
Vacuum air wipe that dries tubing and holds it steady.
View VacuWipe →
Three-axis weir alignment for almost any water trough.
View AccuWeir →Share the tubing you're running and what you need to hold. We'll recommend a setup and send a quote.